Douglas & Stewart were Contracted at the beginning of 2018 by Nord Anglia to strip out 103 000 sqft in what was an old Microsoft Office block in Dublin. The timescale was driven by having the building ready for the start of Winter term in September 2018.
The building was stripped back to its original concrete frame. Douglas and Stewart then rebuilt the interior to the high specification required by the school including modern class rooms, music and dance studios, high tech science labs, new external paths and astro pitches.